WireLine

Last update: August 4th, 2021

OUTLINES:

1. When wireline is used and the different types available
2. Wireline equipment in different operating environments.
3. PCE required for wireline operations.
4. Primary barrier elements used during wireline operations.
5. Slickline primary barrier sealing elements and how to operate them correctly.
6. Braided line/electric line primary barrier sealing elements and how to operate them correctly.
7. Primary barrier element integrity during wireline operations.
8. Secondary barrier elements (wireline BOPs) used during wireline operations.
9. BOP ram configurations for different types of wireline.
10. How to operate secondary barrier elements (slickline BOPs).
11. How to operate secondary barrier elements (braided line/electric line BOPs).
12. Wireline shearing devices.

13. Grouping barrier elements into barrier envelopes during wireline operations.
14. The PCE rig-up during wireline fishing operations.
15. Secondary barrier elements and envelopes for slickline operations if a primary barrier element fails.
16. Secondary barrier elements and envelopes for braided line/electric line operations if a primary barrier element fails.
17. The equipment required for a safe and compatible wireline PCE rig-up.
18. The specific requirements for pressure testing/function testing PCE including wireline BOPs, shear/seal BOPs and valves.
19. Testing the BOP with test rods.
20. The reason for wireline drift runs.
21. Surface Controlled Sub Surface Safety Valve (SCSSSV) integrity during a wireline operation.
22. Use and limitations of wireline cutter bars.
23. Force created by well pressure, flow and conditions compared to tool string/cable weight.
24. Tool string positioning across the wireline BOP.
25. Operating a wireline BOP.
26. How to shut in the well quickly and safely with or without wireline in the hole.
27. What to do if there are defects that could affect BOP function during a wireline operation.
28. What to do if there is a failure in one component of the PCE during a slickline operation.
29. What to do if there is a failure in one component of the PCE during a braided line/electric line operation.
30. What to do if the wire is damaged during a wireline operation
31. What to do if there is a hydraulic control line leak on the Xmas Tree hydraulic master valve during a wireline operation.
32. What to do if the hydraulic control line of the Surface Controlled Sub Surface Safety Valve (SCSSSV) leaks during a wireline operation.
33. What to do if the BOP hydraulic control unit or hoses fail during a wireline operation
34. What to do if the wire breaks and falls downhole during a wireline operation.
35. What to do if an alarm sounds when wireline is in the well and you are required to muster in a safe area.